To make an exchange order, you must be fully registered and verified in OBSIDIAM and have a balance in the wallet of the digital asset to be exchanged.
To make an order, the process begins in the exchange of digital assets, after that, in the basic exchange you can see by default the options of Market Order and Limit Order or follow through button for other types of orders where you can choose between the following:
- Market Order
- Limit Order
- Stop Order
- Stop Limit Order
- Trailing Stop Order
Depending on the type of order selected, the required fields must be filled in so that the order is properly configured.
When the order has been taken, the system notifies the user.